For service points fed by PG&E's distribution grid, and due to PG&E’s Primary Service requirements outlined in
the Wholesale Distribution Tariff (WDT, Version 3), SFPUC is no longer able to
accept any non-Primary applications for Permanent service interconnections to
PG&E’s distribution grid, regardless of load, as of 4/15/2021.
Temporary or Construction Power
applications can continue to be designed with the most appropriate service
interconnection.
Refer to the
Application Checklist to complete this form. Submit separate forms for temporary construction power and permanent power.