1. Fill out the below questions and you will receive an estimate in minutes!

  2. After reviewing your estimate the next step is to book in a building inspection.
    At the building inspection a WeDo project manager will attend your home, review your kitchen plans, survey the site and finalise the estimate. During the building inspection you can add additional works or services as well as remove any. 

  3. After the building inspection we can lock in the start date
Ready to get started? scroll down 👍




Trade Service Estimator
Cabinet Installation
Base & wall cabinets

Tall cabinets

Tall cabinets start at the floor and extend up to meet the top of wall cabinets.
Drawers

Enter the total number of drawers in your new plan. e.g. if the kitchen plan has only 1, x3 drawer unit, you would enter 3.
Panels
Fillers


Cabinet Accessories

Leave blank if none

Leave blank if none
An example of a pull out accessory would be a pull out bin.

Stone Benchtops
The stone suppler will complete the stone installation.
Laminate Benchtops


Enter qty of cutouts for sink, cooktop, etc

Benchtop LM will be rounded up to nearest 0.5 LM


Leave blank if none



Bulkheads

Do not include bulkheads unless it's a must. Add on during building inspection





Do not include flu cover unless it's a must. Add on during building inspection if needed.

Installation - Additional Items
Installation - Additional Item 1


$


$
Installation - Additional Item 2


$


$
Installation - Additional Item 3


$


$

Other Trades
Demolition
  1. During the demolition process we remove and dispose all of the old cabinetry, appliances and splashback cladding. You can elect to keep the appliances to be reused or sold.




Plumbing
  1. Our registered plumbers will attend prior to demolition to disconnect the sink & tap along with any gas appliances so they can be safely removed by the demolition team.
  2. After the demolition is complete the plumber "roughs in" the new water and gas services in the correct locations.
  3. After the installation of the cabinets and benchtop is complete the plumber returns to "fit off" AKA connect the water and gas services that were roughed in earlier in the process.



Electrical
  1. Our registered electricians will attend prior to demolition to disconnect any electric appliances so they can be safely removed by the demolition team.
  2. After the demolition is complete the electrician "roughs in" the new services in the correct locations.
  3. After the installation of the cabinets and benchtop is complete the electrician returns to "fit off" AKA connect the services like appliances and power points that were roughed in earlier in the process. 




SGPO's are auto added for oven, cooktop, dishwasher and rangehood. Dont include them here





Plaster

During the demolition process the splashback area is removed. Normally during this process the plaster behind the splashback material cannot be saved. A plasterer will attend to replace this plaster, ready for the new splashback.

Also, wall & ceiling plaster may need repair where new services are run, or where bulkheads or joinery removed.



This will be rounded up to the nearest 2.4m sheet and includes stopping and patching



Splashback

We offer 2 splashback services. We can tile the splashback area or we can install an acrylic / laminate splashback panel.

Option 1 - Our tiler will attend site after the cabinetry and benchtop is installed to complete the splashback tiling.

Option 2 - After the installation of the benchtop is complete we install the acrylic / laminate splashback.



Tile Splashback

CERAMIC OR PORCELAIN - Tile size 200 x 200 - 600 x 600

Acrylic / Laminate Splashback

Enter metres of splash back width
Enter how many metres wide your splashback is in total. e.g. 3.5
Post Demolition Rubbish Removal
  1. Post demolition rubbish removal is available for all incidental rubbish that occurs throughout a project. Cardboard from packaging, off cuts from plaster, tile, cabinets etc. If post demolition rubbish removal is not included this rubbish will be left onsite.

Cleaning
  1. Construction clean of area during the project, after the stone benchtops have been measured. Wipe down all surfaces, vacuum & mop floors in project thoroughfare and main living zones, clean inside toilet if being used by trades.
  2. Final clean of area at completion of project. Wipe down & polish all surfaces & fittings inc window frames/architraves/skirting, vacuum & mop floors, polish all glass & mirrors, clean cabinets inside & out, vacuum & wipe walls in thoroughfare used during the project. Remove and all floor protection. If not included no cleaning will occur.



 
%
This amount will be added onto the quote and spread out over all included trades.
After submitting, the next step is to review and send to the client from the online estimate in Salesforce.